Specialized Technology Service
Project Management in super-tall building construction
We have completed landmark construction of super-tall buildings (100-stories) with cutting-edge technology and advanced management techniques.
Based on technical excellence and rich experience of delivery various super-tall buildings in Korea,
we create the highest value of super-tall building projects by performing overall tasks such as cost, schedule, quality,
and safety through design management from the construction planning stage. We have the best engineering skills and in-depth knowledge
for managing super-tall landmarks, including preliminary design and structural design optimization through PCA (Pre-Construction Activity),
and construction quality management using GPS.
Pre-construction capability through experience in super-tall buildings (100 stories)
Clear solution against risks in each sector of a super-tall building project
Excellence in construction cost and schedule reduction
Inception and planning of super-tall building construction
Integrated management capability of design, procurement, construction
In-depth knowledge on saving energy and maintenance costs
HanmiGlobal's unique solutions for super-tall building projects based on
comprehensive experience of shaping the skyline of cities with high-level technologies
BIM
(Building Information Modeling)
We provide differentiated BIM Service and efficient project management to reflect the customer needs.
Since the Fourth Industrial Revolution compelled most industries to embrace digital transformation, we have established a pre-emptive plan to leverage dedicated BIM experts to strengthen the global competitiveness and continuously provide professional BIM training.
We have built BIM Infra to generate and utilize BIM data during the project lifecycle
HanmiGlobal BIM Infra
Effects of BIM Service
- Estimation and management of conceptual construction cost at design stage
- Support accurate decision-making of customers using visual designs of buildings to minimize design changes
- Removal of waste due to inconsistency between design and construction
- Compliance with project schedule and budget through design optimization
- Integrated management of cost and schedule in construction phase
|
Efficient project management with BIM Services that reflect client needs |
Professional services by sector
The top experts in each field offer customized professional services
for the clients to select the area in need
- Planning and feasibility review
- Design management
- Cost management
- Schedule management
- Due Diligence
- Claim management
- QIT
- Facility
Management
- L.T.A
2DAY cycle

HanmiGlobal's 2DAY Cycle patent is a ‘concrete structure construction method to build one floor every two days’.
It is a method to complete the RC structure frame construction designed with flat slabs by building one floor every two days
(HG Patent No. 10-1324161, Service Registration No. 41-0310193)
<Korea>
<China>
<Macau>
<Indonesia>